Pulp and paper · SPT, DMT and MASW+

Soil compaction verification on an industrial project

Background

A large project had a contractual requirement to compact the soil down to 6 m. The contractor’s own tests showed results within specification. Even so, there were technical signs that the work had not been carried out as specified.

What we did

We ran an integrated campaign with:

36SPT points

7DMT soundings

50MASW+ stations

Findings

~3 meffective compaction (contract: 6 m)

4–12 msoft natural soil, no effective compaction

20–25%of points failed below 4 m

The failures below 4 m were consistent with the contractor’s own tests.

Outcome

Work redone

The contractor acknowledged the issue and returned to site to compact the soil to the 6 m required by contract.